Kitchen Renovation Electrical in Toronto: Circuits, Timing & Permits
Photo: Tomwsulcer / Wikimedia Commons, CC0
A kitchen is the hardest-working room in most homes in Toronto and the GTA. It also carries more electrical load than almost any other room. Ranges, dishwashers, fridges, microwaves, range hoods, under-cabinet lights and the small appliances that live on the counter all need power in the right place.
If you are searching for a kitchen renovation electrician in Toronto, this Guide explains how the electrical side fits into a kitchen project: which circuits to plan for, when the electrician needs to be on site, and how the ESA permit works.
For a broader look at our role on renovations, see What a Renovation Electrician Does.
Why Kitchens Need Their Own Electrical Plan
Older Toronto kitchens were often wired for a fridge, a range and a few receptacles. Today's kitchens usually add a dishwasher, a built-in or over-the-range microwave, a stronger range hood, an island with power, more lighting and more counter receptacles.
Each new load affects the circuits in the room and, sometimes, the capacity of the whole panel. A good electrical plan is made before cabinets are ordered, so the right boxes and circuits end up in the right places.
Common Kitchen Circuits to Plan For
Every kitchen is different, and the exact requirements come from the Ontario Electrical Safety Code and the appliance manufacturers' instructions. In general terms, a kitchen plan often looks at:
- Range or cooktop and wall oven. Electric cooking appliances typically need their own higher-capacity circuit.
- Dishwasher. Usually on its own circuit, close to where it will sit.
- Refrigerator. Often planned on a dedicated circuit.
- Microwave. Built-in and over-the-range units are commonly given their own circuit.
- Range hood. Power where the hood will mount, plus the switch or control location.
- Counter receptacles. Kitchen counters have specific code requirements for how receptacles are spaced and circuited, and for ground fault protection near sinks.
- Island or peninsula. If you want receptacles on an island, plan them early, since the floor and cabinet layout affect how power gets there.
- Lighting. Ceiling lights, pot lights, pendants over the island and under-cabinet lighting, plus where each switch goes.
This is a planning list, not a wiring guide. Your licensed electrician confirms what your specific kitchen needs.

Diagram: Electro Group Ltd. Inspection stages per ESA, esasafe.com/notifications-and-inspections
Timing: When the Electrician Comes In
The order of work matters more than the speed. In a typical kitchen renovation the electrical work happens in two visits around the other trades:
- Planning. Before demolition, we look at your layout, appliance list and existing panel.
- Rough-in. Once walls and ceilings are open, boxes are set and new branch circuit wiring is run.
- Rough-in inspection. ESA describes the rough-in inspection as taking place when branch circuit wiring and outlet boxes are installed and before wiring is hidden by insulation, vapour barrier or drywall.
- Close-up and finishes. Drywall, cabinets, counters and backsplash tile go in.
- Devices and fixtures. Receptacles, switches, lights and appliance connections are completed.
- Final inspection. ESA's guidance is to request the final inspection as soon as possible after the electrical installation is complete.
The key point for homeowners: don't close the walls before the rough-in is inspected. Cabinets, tile and backsplashes are much harder to work around after the fact.
We don't promise durations. How long a kitchen takes depends on scope, the other trades and inspection scheduling, which is set by ESA.
Does a Kitchen Renovation Need an ESA Permit?
ESA explains that a renovation inspection covers any change to original wiring, including the repair and replacement of devices. Adding circuits, moving receptacles and installing new lighting during a kitchen renovation are changes to the wiring.
ESA also advises that when you hire someone for electrical work in your home, by law it must be a Licensed Electrical Contractor, and that Licensed Electrical Contractors file the notification of work (the permit) with ESA.
We take out the ESA permit and arrange the inspection. When the work passes, ask for the ESA Certificate of Acceptance and keep it with your renovation records.
If you're working with a general contractor, ESA recommends making sure the electrician on the job is a Licensed Electrical Contractor and that a permit is taken out. Our Guide on how to verify a licensed electrician in Ontario shows how to check.
Will My Panel Handle a New Kitchen?
Sometimes yes, sometimes no. A new kitchen can add several circuits, and some homes don't have the panel space or service capacity to support them alongside other plans, such as an EV charger or heat pump.
Part of our planning visit is looking at your panel. If the kitchen is the moment to look at more capacity, see 100 Amp vs 200 Amp Service: What Toronto Homeowners Need to Know.
Condo Kitchens
Condo kitchens add another layer. Many condo buildings have rules about renovations, working hours and approvals. We help with condo board and property manager communication on the electrical side, but you as the owner may still need to be involved in approvals and building requirements.
Kitchen vs Basement Projects
If you're planning more than one room, the process is similar but the loads are different. A basement often focuses on lighting, receptacles and a new living space, while a kitchen focuses on appliance circuits. See Basement Renovation Electrical in Toronto for how that project type works.
A Planning Checklist for Homeowners
Bring these to your first conversation with an electrician:
- Your kitchen layout or designer's drawings
- A list of appliances, including model numbers if you have them
- Where you want the island, pendants and under-cabinet lights
- Any other electrical plans for the home (EV charger, heat pump, addition)
- Your renovation schedule and who your other trades are
Please don't do your own kitchen electrical work. Hire a Licensed Electrical Contractor with an ESA permit.
Electro Group Ltd. holds ESA Licence #7017939.
Next Steps
Planning a kitchen renovation in Toronto or the GTA?
Tell us your city, home type, layout and appliance list. We'll walk through the circuits, plan the rough-in around your other trades, and take out the ESA permit.
Electro Group Ltd. · Toronto and the GTA · 289-814-7241 · ESA Licence #7017939
FAQ
When should I call an electrician for a kitchen renovation?
Before cabinets are ordered and before demolition, so circuits and boxes are planned around the final layout.
Do kitchen appliances need their own circuits?
Many major kitchen appliances are commonly planned on their own circuits. The exact requirements depend on the code and the appliance instructions, and your electrician confirms them for your kitchen.
Who takes out the ESA permit for my kitchen?
We do. We take out the ESA permit and arrange the inspection.
Can drywall go up before the electrical inspection?
ESA's rough-in inspection takes place before wiring is hidden by insulation, vapour barrier or drywall, so plan for it before closing the walls.
How long does kitchen electrical work take?
It depends on the scope, the other trades and inspection scheduling. We don't promise durations, but we plan our visits around your renovation schedule.
Related Services
Need a Licensed Electrician?
Get a Free Quote Call 289-814-7241
Licensed electrical contractor · ESA Licence #7017939